Greater Cairo Metro Project Metro Project Shubra El Kheima Station Steel Foot Bridge, Egypt

Cairo, Egypt
National Authority of Tunnel

A 40 m skew steel foot bridge located near Shubra El Kheima station in greater Cairo Metro Line.

The bridge consists of two  continuous spans (17.05 m, 20.647m) and two steel stairs in the same direction 20m long, and two reinforced concrete stairs in two opposite directions. The main girders are topped with 10cm reinforced concrete slab.

Scroll to Top