•The 30m Cable Stayed Foot bridge consists of two equal spans (2x15m). Cables with different lengths are used to support the main girder
•Main elements of bridge are welded plate girders using the available plates and sections manufactured in local mills. The12 cm. reinforced Concrete slab decking support on steel beams (cross girder).