Greater Cairo Metro Line 2
EHAF is a member of the consulting group responsible of the preparation of the design and pre-contract documents as follows:
Architectural and Arrangement Works for Underground Part: El Mazallat Station, El Khalafawi Station, St. Theresa Station, Rod El Farag Station, Massara Station, Mubarak Station, Attaba Station, El Awkaf Station, Sadat Station, Annexed Structures.
Architectural, Arrangements and Civil Works for Overground Part:Kolyet El Zeraah Station, Shubra El Kheima Station, Pedestrian Overpasses